Angebot
Katalog

Production & Planning

Efficient production with Tepe Prefabrik A.S.

The process “Production and planning” At Tepe Prefabrik A.S., the central phase is following the Engineering and design phase Dar. The aim of this process is to create a efficient and customer-oriented production plan to create that optimally meets customer requirements. As a result of close coordination between departments, a on-time production with highest product quality and cost efficiency guaranteed.

Production and planning process flow

1. Basis: Decisions from engineering and design

The production and planning phase is based on the results from the engineering and design phase.

2. Preparation of the production plan

To ensure efficient use of resources, a production plan is drawn up. The aim is to optimize the entire production process in such a way that customer demand and delivery dates are met.

3. Interdepartmental coordination

The production plan is coordinated with relevant departments such as manufacturing, engineering, finance and material procurement.

4. Input from the marketing department

In order to be able to react flexibly to market trends and customer requirements, information from the marketing department is incorporated into the production plan.